Tip: With no transmission on the back of the engine, use some Scotch-Brite or fine sandpaper to smoothen out the dowel pins for easier installation. Then apply a thin layer of grease to the hub before installing.
|
|
Install the range selector lever from the old transmission onto the new transmission.
|
|
Install the range selector bracket from the old transmission onto the new transmission.
|
|
With transmission well supported, raise transmission up to back of engine while simultaneously installing the transmission dipstick tube with the new seal provided.
|
|
Slide the transmission onto dowel pins. The torque converter must rotate feely by hand. Ensure the transmission is seated as well as possible and align the bolt holes between the flywheel and the torque converter before threading in any bolts.
|
|
Once fully seated, fully insert the transmission dipstick.
Install all 8 x bolts to attach the transmission to the engine using a 15 mm socket.
Snug all 8 bolts before torqueing to 37 lb-ft (50Nm).
Note: The bottom right bolt holds the cooler line bracket in place.
|
|
Attach the transmission vent tube to the port on the top of the transmission.
Reposition the fuel line and vent tube to the brackets on the driver’s side and install 1 x bolt using a 10 mm socket.
Torque bolt to 89 lb-in (10Nm).
|
|
Install the 1 x bolt that holds on the cooler bypass block using a 13 mm socket.
Torque down to 16 lb-ft (22Nm).
|
|
Push in the transmission electrical connector with the black tab facing up and turn clockwise.
Then push in the white tab to lock it in place.
Install the 1 x bolt that holds the wire in place using a 10 mm socket.
Torque bolt to 13 lb-ft (17Nm).
|
|
Install the range selector cable (2) to the range selector cable bracket and the range selector lever ball stud. Install the range selector retaining clip (1) to the transmission.
|
|
Install the 2 x bolts that hold on the transmission heat shield using a 10 mm socket.
Torque bolts to 13 lb-ft (17Nm).
|
|
Position up the front up the exhaust to both collectors on the exhaust manifolds.
Note: It is highly recommended that the exhaust gaskets are replaced when putting back on exhaust.
GM Part #:
- 15715548 (ring)
- 15035747 (cone)
|
|
Install 3 x nuts on both sides of the exhaust using a 15 mm socket.
Torque nuts to 37 lb-ft (50 Nm).
Connect all four O2 sensor connectors. There are two on each side.
|
|
Connect front of exhaust to rear section with the ball flange and install 1 x bolt using a 13 mm socket.
Torque bolt to 21 lb-ft (28Nm).
|
|
With the transmission supported, line up the studs on the end of the transfer case and slide into the holes on the back of the extension housing.
Tighten 6 x nuts to 37 ft-lb (50Nm) using a 15 mm socket.
Note: It is recommended that you replace the paper gasket on the transfer case.
Gm Part # 24245110
|
|
Install all three electrical connectors into back of transfer case.
|
|
Install the 2 x bolts that hold on the transmission mount using a 15 mm socket.
Torque bolts to:
-
40 lb-ft (55 Nm) for light duty
-
79 lb-ft (107 Nm) for heavy duty
|
|
Install the transmission cross member
with the 4 x bolts and nuts on the outside using a 21 mm socket and the 2 x nuts that screw onto the transmission mount studs using a 15 mm socket.
For light duty trucks:
Torque 21mm nuts to 70 lb-ft (95 Nm)
Torque 15mm nuts to 41 lb-ft (55 Nm)
For heavy duty trucks:
Torque 21mm nuts to 89 lb-ft (120 Nm) + 90 degrees
Torque 15mm nuts to 79 lb-ft (107 Nm)
|
|
From the torque converter access hole, push the torque converter forward through the access hole to seat the converter pilot into the crank bore.
Apply a thin line of blue Loctite to the converter bolt threads and thread in all bolts by hand before torqueing.
Once all bolts are snug, torque down bolts to 48 lb-ft (65 Nm).
|
|
Install the flywheel inspection cover on the passenger’s side with 1 x bolt using a 10 mm socket.
Torque bolt 106 lb-in (12Nm).
|
|
Install the starter motor.
Note: This will vary between vehicle models. The following steps apply to Sierra’s and Silverado’s.
Position the starter motor in place and install the 2 x bolts that hold the starter in place using a 13 mm socket.
Torque bolts to 37 lb-ft (50 Nm).
|
|
Install the 1 x nut that holds on the positive battery cable using a 13 mm socket.
Torque nut to 106 lb-in (12 Nm).
Connect the electrical connector below the battery cable.
|
|
Install the 2 bolts that hold on the starter heat shield.
Tighten bolts until snug.
|
|
Install the torque converter access plug.
|
|
Install the flywheel inspection cover and 1 x bolt using a 10 mm socket.
Torque bolt to 106 lb-in (12Nm).
|
|
If the vehicle is equipped with a front drive shaft, install the slip yoke on the front driveshaft into the front of the transfer case.
Use a flathead screw driver or small pry bar to push boot clamp into position.
|
|
Align the reference marks made during removal and install the 2 yoke retainers and 4 x bolts using a 11 mm socket.
Torque bolts to 18 lb-ft (25 Nm).
|
|
Install slip yoke of rear driveshaft into the back of the transfer case.
Align the reference marks made during removal and install the 2 yoke retainers and 4 x bolts using a 11 mm socket.
Torque bolts to 18 lb-ft (25 Nm).
|
|
Install the 8 bolts that hold on the steering gear skid shield.
Torque down the top 13mm bolts to
15 lb-ft (20 Nm).
Torque down the other 6 bolts to 80 lb-in (9 Nm).
|
|
Run the transmission vent hose overtop of the transfer case and lock in place with the clip on the transmission cross member.
|
|
Install inner fender liner on the passenger’s side. Re-install the wheel and torque lug nuts to 140 lb ft (190 Nm).
|
|
Reconnect the battery terminals.
|
|
Fill the transmission with 8 quarts of Dexron VI fluid.
Note: You will not be able to start or drive the vehicle until the TECHM has been reprogrammed.
|
|
Reprogram the TECHM using either an MDI2 scan tool with J2534 interface and GM Techline Connect (https://www.acdelcotds.com/) or HP Tuners. The following steps outline how to reprogram using GM Techline Connect. For more information, contact Monster Transmission via https://monstertransmission.com/pages/contact.
Note: During programing, ensure your battery is hooked up to a battery maintainer so that the voltage stays between 12 and 16 volts.
|
Go to www.acdelcotds.com and purchase an SPS2 license for one vehicle.
|
|
In “Subscriptions”, click “View” on the SPS2 and click “Add VIN” on the pop-up.
|
![image.png]()
|
A Techline Connect window will open. Make sure Techline Connect is properly installed. Click “Launch Techline Connect”.
|
![image.png]()
|
Hook up the vehicle to a battery maintainer and plug in the J2534 device. Turn the ignition on.
|
|
In Techline Connect, connect the J2534 device and the vehicle. Ensure the VIN populates correctly. Click “Next”.
|
|
For a vehicle 2016 or older, follow this step.
Click the “Engine and Transmission Control Modules” and select “Without RPO M5U”. Click “Next”.
|
![]()
|
For a vehicle 2017 or newer, Follow the next two steps.
Select “Transmission Control Module” and “Programming”. Click “Next”.
|
|
Select “Without RPO M5U”. Then click “Next”.
|
|
Click through with the “Next” button until you get to the “Start Programming” button and click it. Wait for the programming to finish. A progression bar and estimated time remaining will appear.
|
![]()
|
Clear DTCs. Then click “Proceed Same VIN”. You will be taken back to the controller selection page.
You are now finished programming.
|
![]()
|
Start the engine for a few seconds, then turn off ignition. Add 4 quarts of AC Delco Dexron VI fluid then start engine again. Allow engine and transmission to warm up until the transmission temperature is between 160oF and 200oF (71oC and 93oC).
|
Shift from drive to reverse a few times then return to park and recheck the fluid level. Top up fluid as necessary.
For a more detailed procedure, refer to your Service Manual.
|
Use a scan tool to perform Reset Transmission Adapts. For a step-by-step procedure, refer to your service manual.
|
Perform a Road Test. For a step-by-step procedure, refer to your service manual.
|
Recheck transmission fluid level and inspect for leaks.
Installation is complete.
|